Posted in FINANCE German Facility, Built at Breakneck Speed, Accepts LNG From U.S. January 3, 2023 The shipment arrived at the import terminal for liquefied natural gas in the port town of Wilhelmshaven, a facility that was built in less than a year to help Germany avert an energy shortage. https://www.wsj.com/articles/german-facility-built-at-breakneck-speed-accepts-gas-shipment-from-u-s-11672752295?mod=pls_whats_news_us_business_f