German Facility, Built at Breakneck Speed, Accepts LNG From U.S. January 3, 2023 The shipment arrived at the import terminal for liquefied natural gas in the port town of Wilhelmshaven, a facility that was built in less than a year to help Germany avert an energy shortage. https://www.wsj.com/articles/german-facility-built-at-breakneck-speed-accepts-gas-shipment-from-u-s-11672752295?mod=pls_whats_news_us_business_f