Architect firm hired to design Grenfell Tower refurbishment which saw flammable cladding wrapped around building before the disaster is blocked from closing down

Studio E, who were hired to design Grenfell Tower refurbishment and saw flammable cladding wrapped around building, has been blocked from shuttering. 

https://www.dailymail.co.uk/news/article-13819355/architect-firm-grenfell-flammable-cladding-blocked-closing.html?ns_mchannel=rss&ns_campaign=1490&ito=1490